Ignitis Renewables, an international green energy company, has completed another significant project. Silesia wind farm II, located in the south of Poland, Opole Voivodeship, has reached the commercial operation date. The wind farm is equipped with 38 Nordex N117/3600 wind turbines and has a total installed capacity of 137 megawatts (MW).